Presentations
Irradiation test of the GE21 Optohybrid Board at TAMU Cyclotron, 11 June 2021.
pdf file.
Optohybrid Board for GE21, 10 April 2018. ppt
and pdf files. Presented at the
GEM/CSC Forward Muon Upgrade Workshop, TAMU 9-11 April, 2018.
CSC Hardware Upgrade Status, 15 June 2017. ppt
and pdf files.
Presented at the
Muon Phase II Upgrade Workshop, CERN 14-16 June, 2017.
Irradiation tests of Xilinx and Cypress PROMs at UC Davis. May 2017.
pptx
and pdf files.
Artix-7 Evaluation Boards and Irradiation Studies
of Flash Memories and Xilinx 7 Series FPGA.
pdf file
CCB to GEM Optohybrid Board Copper Interface, 12 November 2015. pptx
and pdf files.
Local Triggering with the Upgraded CSC Track Finder. 4 November 2015. pptx
and pdf files.
Custom mezzanine board for the MTF7 Processor, 14 May 2015. pptx
and pdf files. Short specification
docx and pdf files.
TTC Options for ME234/1 Electronics Upgrade, 12 August 2014. pptx
and pdf files.
Presented at the
ME234/1 Electronics Workshop at Northeastern University, Boston 12-13 August, 2014.
Virtex-5 Mezzanine for the Muon Sorter MS2005 Baseboard, July 2014. pptx
and pdf files.
CSC Endcap Muon Port Card and Muon Sorter Status, October 2013. pptx
and pdf files.
Presented at the
US CMS Endcap Muon Collaboration Meeting at TAMU 30 September -1 October, 2013.
Muon Port Card and Muon Sorter Upgrade Status, May 2013.
Pptx and
pdf files.
Irradiation Tests of the Muon Port Card Spartan-6 Mezzanine Board, April 2013.
Ppt and
pdf files.
PPIB and ODMB Board Status pptx
and pdf files.
Presented at the
ME1/1 Electronics Meeting 19 April, 2013.
Patch Panel Interconnect Board Status pptx
and pdf files.
Presented at the
ME1/1 Electronics ESR 27 February, 2013.
Freting Corrosion pptx
and pdf files.
Presented at the
2nd CSC LS1 Planning Workshop 25-26 February, 2013.
ME1/1 Active Patch Panel Status pptx
and pdf files.
Presented at the
ME1/1 Project Meeting 25 January, 2013.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF ppt
and pdf files.
Presented at the
CMS Upgrade Week at CERN 31 October, 2012.
Muon Port Card Upgrade Status ppt
and pdf files.
Presented at the
CSC Trigger Upgrade Meeting at Rice University August 17, 2012.
ME1/1 Electronics Integration and Commissioning ppt
and pdf files.
Presented at the
USCMS Review of ME1/1 Electronics Progress July 20, 2012, Fermilab.
Upgrade of the CSC Endcap Muon Port Card, May 2012.
Ppt and
pdf files.
CSC ME1/1 Upgrade: Status of Electronics Design ppt
and pdf files.
Presented at the
CMS CSC ME1/1 Upgrade ECR Meeting March 28, 2012.
Upgrade of the CSC Endcap Muon Port Card, 1 November 2011.
Ppt and
pdf files.
CERN QPLL Locking Range with the custom 120.23605MHz and 160.31474Mhz crystals;
measured on two boards (mezzanine #6 and #7) with 10 pairs of samples each.
Ppt and
pdf files.
Irradiation Tests of the Muon Port Card Virtex-5 Mezzanine Board, 2 August 2011.
Ppt and
pdf files.
Update on Muon Port Card Mezzanine FPGA Board Revision 2, 24 May 2011.
Ppt and
pdf files.
CSC Endcap Muon ME1/1 Upgrade Status.
Presented at the
3rd Common Atlas-CMS Electronics Workshop for SLHC Upgrades March 9, 2011.
Update on CSC Endcap Muon Port Card Board, 24 January 2011.
Ppt and
pdf files.
Update on Muon Port Card FPGA Mezzanine Board.
pdf files.
Presented at the
CSC Electronics Upgrade Meeting July 28, 2010.
Update on CSC Muon Port Card and Optical Link to Track Finder.
Ppt and
pdf files.
Presented at the
CSC Electronics Upgrade Meeting at Ohio State University, April 23-24, 2010.
TTCrx Issues.
Ppt and
pdf files.
Presented at the EMU Electronics Upgrade Meeting at Rice University, December 17-18, 2009.
Muon Port Card, Optical Link and Muon Sorter Upgrade Status.
Ppt and
pdf files.
Presented at the
EMU Electronics Upgrade Meeting at Rice University, December 17-18, 2009.
CSC Electronics Upgrade. Presented at the
US CMS SLHC Trigger Upgrade Workshop at CERN, July 25, 2009.
Muon Port Card Upgrade. Presented at the
US CMS SLHC Trigger Upgrade Workshop at the University of Florida, Gainesville, April 27-28, 2009.
CCB & MPC Status and
Muon Sorter Status.
Presented at the
CSC System Overview at Rice University, Houston, January 8-11, 2009.
Databus Systems in High Energy Physics: Past, Present, and Future. January 28, 2008.
Electronics Design Challenges and Solutions for the SLHC Era. January 17, 2008.
Technologies and Choices for the SLHC EMU/Trigger Upgrade. Presented at the
1st SLHC Endcap Muon Workshop at the University of Florida, Gainesville, January 8, 2008.
Mezzanine Upgrade for the EMU/Trigger Electronics. Presented at the
US Endcap Muon Meeting at Fermilab, 19-20 October 2007.
FPGA Reconfiguration Time for EMU/Trigger boards. 11 May 2007.
Brief History of the EMU Trigger Motherboard. 5 March 2007.
Proposal
on a New FPGA Mezzanine for the CSC EMU/Trigger Upgrade. 2 May 2007.
Some
Technical Details on TTCrx ASIC, TTCrq mezzanine and CCB2004 board.
28 February 2007.
Recent
Developments in Hardware/Firmware (CCB2004, MPC2004, MS2005). 19 February 2007.
Data Serialization, Transmission and Deserialization at 3.2Gbps and Beyond.
Pdf file.
3 April 2006.
Performance Comparison of the SBS 620, CAEN V2718 and OSU VME Crate Controllers.
Pdf file.
14 February 2006.
Tests of the Fully Loaded CSC Track Finder
Backplane.
Ppt and pdf files.
2 May 2005.
CSC EMU/Track Finder Clock and Control Board. Status and production plans.
Ppt and pdf files.
EMU Trigger Review at Rice University, 27 August 2004.
CSC EMU Muon Port Card. Status and production plans.
Ppt and pdf files.
EMU Trigger Review at Rice University, 27 August 2004.
CSC EMU Muon Sorter. Status and production plans.
Ppt and pdf files.
EMU Trigger Review at Rice University, 27 August 2004.
EMU Peripheral Backplane. Timing with the CCB'2004.
Ppt file. 26 April 2004.
CSC Data Link Design Challenges for SLHC Upgrade.
Pdf file. Presented at the
US CMS SLHC Trigger Workshop at the University of Wisconsin, Madison, 13 February 2004.
Sector Processor-to-Muon Sorter Tests.
Ppt
and Pdf files. Presented at the
EMU Track Finder Meeting at the University of Florida, 8 January 2004.
CSC Muon Sorter. Status, Tests, Plans.
Ppt
and Pdf files. Presented at the
EMU Trigger Meeting at Rice University, 21-22 August 2003.
Link Test Scheme.
Pdf file.
CSC Muon Port & Sorter Cards.
Pdf file. Presented at the
Trigger Meeting, CPT Week at CERN, 5 May, 2003.
MPC & SBS 620 Rad Tests.
Pdf file. Presented at the
Trigger Meeting, CPT Week at CERN, 5 May, 2003.
Slice Test DAQ.
Pdf file. Presented at the
TriDAS Meeting, CPT Week at CERN, 5-8 May, 2003.
Slice Test/DAQ Integration Plans.
Pdf file. Presented at the
US CMS EMU Meeting at University of Florida, 28-29 March 2003.
Muon Sorter Design Status.
Ppt
and Pdf files. Presented at the
CSC Trigger Meeting at UCLA, 9 January 2003.
CSC Trigger Status.
Ppt file. Presented at the
CMS Trigger Meeting at CERN, 5 November 2002.
Muon Port Card and Muon Sorter Design Status.
Pdf file. October 10, 2002.
Muon Port Card Testing Progress.
Ppt file. Track Finder Meeting, Rice University. August 22-23, 2002.
Muon Port Card Design Status.
Pdf file. Track Finder Meeting, Rice University. August 22-23, 2002.
CSC Muon Trigger On Detector Components.
Ppt files. Presented at the
US CMS EMU Meeting at
CERN, 10-12 June 2002.
Clock Propagation Delays over EMU Peripheral Backplane
Pdf file. May 9, 2002.
Muon Port Card Design Status and TTCrx Jitter.
Pdf and Ppt
files. EMU Trigger Meeting at the University of Florida. 23-23 March 2002.
Muon Port Card Design Status.
Track Finder Meeting at UCLA. 14-15 December 2001.
CSC Port Card & Optical Tests. Presented at the
CMS Trigger Meeting. CERN, 6 November 2001
Evaluation of the RTL Synthesis Tools for FPGA/PLD Design.
Track Finder Meeting at Rice University. 14-15 August 2001.
Muon Sorter Design Status. Track Finder Internal Review,
May 2001.
The EMU Trigger Status. Presented at the
CMS Trigger Meeting. CERN, 7 March 2001